Powering up Value Stream Engineering to get custom designs to the customer faster
Every year around 16,500 valves from roughly 7,500 order items undergo LESER’s Value Stream Engineering process, equivalent to a sales volume of 30 million euros. To meet increasingly complex requirements as well as customer expectations regarding rapid delivery of custom designs, a five-workday limit has been imposed on the design phase in Engineering. This is an ambitious goal: in the past, the average processing time was 13 days. The new target has been pursued since January 2024 – now the hard work is bearing fruit.
The Product Engineering – Customizing Engineering Line (PE-CEL) team completes the entire engineering process for the customer order within the set, tight time limit. It prepares the drawings, performs strength calculations, releases welding work, designs springs, and obtains approvals where necessary. Furthermore, the team liaises with the Product Development, Industrial Engineering, Product Solutions as well as Certification and Quality Management departments. Only when all technical questions have been answered in full, the material master file and the bill of materials are created, defining the exact properties of the valve.
The Product Engineering – Customizing Engineering Line (PE-CEL) team completes the entire engineering process for the customer order within the set, tight time limit. It prepares the drawings, performs strength calculations, releases welding work, designs springs, and obtains approvals where necessary. Furthermore, the team liaises with the Product Development, Industrial Engineering, Product Solutions as well as Certification and Quality Management departments. Only when all technical questions have been answered in full, the material master file and the bill of materials are created, defining the exact properties of the valve.