Every year around 16,500 valves from roughly 7,500 order items undergo LESER’s Value Stream Engineering process, equivalent to a sales volume of 30 million euros. To meet increasingly complex requirements as well as customer expectations regarding rapid delivery of custom designs, a five-workday limit has been imposed on the design phase in Engineering. This is an ambitious goal: in the past, the average processing time was 13 days. The new target has been pursued since January 2024 – now the hard work is bearing fruit.
The Product Engineering – Customizing Engineering Line (PE-CEL) team completes the entire engineering process for the customer order within the set, tight time limit. It prepares the drawings, performs strength calculations, releases welding work, designs springs, and obtains approvals where necessary. Furthermore, the team liaises with the Product Development, Industrial Engineering, Product Solutions as well as Certification and Quality Management departments. Only when all technical questions have been answered in full, the material master file and the bill of materials are created, defining the exact properties of the valve.

Coordination pays off

Today, customers receive their custom valves within an eight-week lead time, with the internal engineering process taking just five days on average. Many improvements were implemented to make this possible:
Fewer interfaces: Strength calculations and the sizing of custom springs are now carried out directly by the Engineering department, while welding work orders will be provided in the future by a dedicated welding technician who is part of the team.
Standardization: Custom solutions, such as RAFX connections or reduced-height pilot-operated safety valves, have been standardized.
More efficient tools: Using software, such as LASC (LESER Advanced Spring Calculation) for spring sizing, or template tools for supplementary loading systems, reduces cycle times.
Improved quality: Automated checks of parts lists in SAP, a structured Q-reporting process, and weekly quality meetings are all part of LESER’s rigorous pursuit of error prevention.
Flexibility: a structured load management system provides stability when order intake is high.
Global teamwork: An engineering team was formed and trained at LESER India to increase engineering capacity.
Now the highly motivated engineering team is looking forward to new projects.
Team achievement. The PE-CEL team, working closely with the PO-OE production planning team from Value Stream Engineering, has improved processes continuously, reducing lead times.